Training sandbox with interactive zone heat-call simulation (not connected hardware).
ZVC406-5 · training sandbox
Ready — configure gateway and deploy HA Modbus package.
AUX PUMP 1
AUX PUMP 2
AUX PUMP 3
Demo logic only — proves valve timing and priority behavior for training. Deploy real control via the Live product.